AI Risk Assessment
Elevated Failure Risk
41% probability within 90 days
Contributing factors:
- Load approaching rating
- Elevated winding temperature
- Age exceeds fleet median
→ Schedule thermal survey within 4 weeks
Health Score
55/100
Elevated Stress
Current Load
90%
Elevated demand
Winding Temp
81 °C
Above threshold (75°)
Total Runtime
152,300 hrs
Continuous operation
Since Commissioning
21 Years
Late-life status
41% probability within 90 days
Contributing factors:
→ Schedule thermal survey within 4 weeks