Back to grid map

Mirpur Substation

Degraded
Live · --:--:--

Status

Degraded

2 active alerts

Current Load

84.2 MW

Live telemetry

Capacity

120 MVA

Nameplate rating

Utilization

70.0%

Optimal

Transformers

1/2

1 flagged

Local topology

Mirpur (SS)Gulshan SSUttara SSBanani SS
Current SSNormal
WarningCritical

Transformer Asset Details

2 Total Transformers
Asset ID
Load %
Temp
Health
Status
Last Maint.
TR-07
88%
76 °C
62
Warning
2025-11-10
TR-08
54%
58 °C
91
Online
2026-05-28

Load · 24h Trend

Peak: 84.2 MWMin: 45.5 MW

▲ Demand rose 12% vs. yesterday's avg

● Next peak forecast: ~87.6 MW at 18:00

▼ Off-peak window: 02:00 – 05:00

Active Triage Alerts

Transformer overload — TR-07

Risk of automatic trip · 34 min ago

Feeder loss above threshold — F-12

Minor efficiency degradation · 1 h 58 m ago

Connected Output Feeders

2 Active Line Feeders
Feeder ID
Load (MW)
Loss %
Status
F-12 Tejgaon Ind.
58.2 MW
4.6%
Warning
F-03 Mirpur Bypass
39.0 MW
2.1%
Online