Gulshan Substation

Online
Live · --:--:--

Status

Operational

0 active alerts

Current Load

61.5 MW

Live telemetry

Capacity

100 MVA

Nameplate rating

Utilization

61.5%

Optimal

Transformers

2/2

All normal

Local topology

Gulshan (SS)Mirpur SSUttara SS
Current SSNormal
WarningCritical

Transformer Asset Details

2 Total Transformers
Asset ID
Load %
Temp
Health
Status
Last Maint.
TR-12
47%
52 °C
95
Online
2026-06-15
TR-13
51%
55 °C
93
Online
2026-07-01

Load · 24h Trend

Peak: 61.5 MWMin: 33.2 MW

▲ Demand rose 12% vs. yesterday's avg

● Next peak forecast: ~64.0 MW at 18:00

▼ Off-peak window: 02:00 – 05:00

Connected Output Feeders

2 Active Line Feeders
Feeder ID
Load (MW)
Loss %
Status
F-05 Gulshan Sector 3
34.1 MW
1.9%
Online
F-14 Mohakhali Express
50.4 MW
3.9%
Warning